Prime Minister Narendra Modi to gift Pune Metro projects worth ₹21,800 crore on November 3
Inauguration of the Pink Line built at a cost of over ₹8,300 crore and foundation stone-laying of Phase-2 will be done.
By Capital Kranti desk, Gandhinagar · Editor: Parth Thakkar
2 November 2026, 7:56 pm · Updated 4:58 pm · 2 min read
This story was written by AI from the sources listed below; every claim and number in it was checked against them before it went up. How we check
According to reports from PIB Delhi, PIB Ahmedabad and Business Standard, Prime Minister Shri Narendra Modi will inaugurate and lay the foundation stone of Pune Metro projects worth approximately ₹21,800 crore on November 3, 2026 at 12:30 PM via video conferencing.
On this special occasion, Prime Minister Modi will also address a public gathering.
Prime Minister Shri will inaugurate Pune Metro Line-3, built at a cost of over ₹8,300 crore, which is also known as the Pink Line. This Pink Line has a length of approximately 23 kilometres and connects Hinjawadi to District Court Metro Station. This corridor of the Pink Line will provide metro connectivity between the Hinjawadi IT hub and Shivajinagar.
It is particularly noteworthy that the operation of Pune Line-3 will be entirely handled by women train operators. Additionally, it is envisaged that approximately 30% of the total electricity requirements of the Pink Line will be met through solar energy.
During the event, the Prime Minister will also lay the foundation stone for Pune Metro Phase-2, the estimated development cost of which is around ₹13,500 crore. Phase-2 of Pune Metro includes Line-2A, 2B, 4 and 4A.
Under Phase-2, the total length of Line-2A and 2B will be approximately 12.75 kilometres. Line-2A will connect Vanaz to Chandani Chowk, while Line-2B will provide connection from Ramwadi to Vitthalwadi. In addition, Line 4 will be spread over a length of approximately 25.52 kilometres, connecting Kharadi to Khadakwasla. Line 4A will have a length of 6.12 kilometres and will connect Nal Stop to Manek Baag.
These new metro corridors will connect key locations including Kharadi, Magarpatta, Hadapsar, Swargate, Manek Baag, Nanded City, Pune Cantonment and Warje. The eastern extension from Ramwadi to Vitthalwadi will improve connectivity up to the rapidly growing residential, commercial and IT hubs of Kharadi and Wagholi.
These new corridors will be integrated with the existing Pune Metro network and intercity bus services at interchange facilities such as Swargate, Nal Stop and Kharadi Bypass.
Where this story comes from
- PIB दिल्ली
- PIB અમદાવાદ
- Business Standard
- NDTV
- The Economic Times
- The Hindu
- अमर उजाला
- The Economic Times
- दैनिक भास्कर
- PIB Delhi
- Hindustan Times
- Hindustan Times
- PIB Delhi
- NDTV
- PIB અમદાવાદ
- PIB અમદાવાદ
- PIB दिल्ली
Two women apprehended with 10 kg cannabis at Gaya Airport
Narcotics worth approximately ₹10 crore in the international market were seized from the two women arriving from Thailand.
પાણીપુરી વેચનારની ૧.૨ લાખની માસિક કમાણી જાણીને આઈઆઈટીના સ્નાતકો ચોંકી ગયા
ચાર આઉટલેટ્સ ચલાવતા વેપારીની કુલ માસિક નફાની રકમ ૪.૫ લાખ રૂપિયાથી વધુ હોવાનો દાવો
Government announces new standards for semen production for artificial insemination in pigs
New guidelines issued to promote genetic improvement and enhance livelihoods of livestock rearers in North-East India